- Contact Person : Ms. Feng Kathy
- Company Name : Ningling Lanning Technology Co., Ltd.
- Tel : 0086-370-3337890
- Fax : 0086-370-3337890
- Address : Henan,shangqiu city,Room 32, Floor 28, xincheng District ,
- Country/Region : China
- Zip : 476000
Related Product Searches:Automatic waste tyre recycling machinery with CE& ISO 9001 14001,High Quality waste tyre recycling machine ,waste tyre recycling machine LN--2600*6600
Wasyte tyre recycling equipment process:
Put the waste tyres or plastic in to our machine, after catalyzing and heating the tyres are dissociated to gas steam. After cooling ,gas is condensed to tyre oil .The left non-condensate material come back to reactor and burn up. After the furnace ,the carbon black is automatically come out .
The raw material for waste tyre pyrolysis plant as follows:
1. Industrial waste, allow multiple waste mixed simultaneously(more than 70%,but suggest PE, pvc less than10% )
2. Waste oil. Example : waste machine oil, waste oil and diesel slag etc.
3. Waste rubber tyre.
4. Waste cable skin(suggested offer first dealing with chlorine refinfing)
5. Waste PMMA(Methyl methacrylate)
6. Waste tyres ( big truck tyres or bicycle tyres,)
Processing time:
Style | Feeding time(hours) | processing time(hours) | cooling time (hours) | Slag outlet time(hours) |
LN-2200*6000 | 2 | 7 | 2 | 2 |
LN-2200*6600 | 2 | 8 | 2 | 2 |
LN-2600-6000 | 2-3 | 10 | 2-3 | 2-3 |
LN-2800-6000 | 3 | 12 | 3 | 3 |
Factory area: 600 square meters for one set is enough . (including 300 square meters simple shed, storing house covering area 300 m2)
Pyrolysis machine oil output:
Oil yied/day | Used tyres,scrap tyres | Big truck tyres | 45%--50% |
Car tyres | 40% | ||
Bicycles and motorcycles tyres | 30%--35% | ||
Waste plastics | Fishing net,Safety net, farm-oriented film | 45%--50% | |
Conwenient bags , weave bags | 40% | ||
Off –cut of recycled paper mill | 20%--30% |
machine flow chart :
Oil separator with catalyst champer:
improve oil yiled.
improve the quality of oil ,much more purity.
After-sale service:
1, we are responsible of machine installtion and debugging
2, Engineer will assist buyers producing and training workers.
3, Guarantee period for equipment (including accessories) is one year.(Except personal factor damage and quick wear -part). For all standard and non-standard parts, if damaged under normal production during work according to our manual, we will offer deploy unconditionally. For reactor Guarantee period is 4-8years